We build plants!

Autoclaved Aerated Concrete (AAC) block manufacturing plant “Glavstroy-Ust-Labinsk”

Contractor: UNY-Tec LLC Installation period: December 2025 – March 2026

Autoclaved aerated concrete (AAC) block manufacturing plant with a design capacity of 300,000 m³ per year, located in Ust-Labinsk, Krasnodar Region, Russia.

Plant capacity: 300,000 m³of blocks per year.

Production line: WEHRHAHN (Germany) and wall panel equipment by Runding .

Installation period: December 2025 – March 2026.

11-2 Image-3
previous arrow
next arrow
11-2 Image-3
11-3 PHOTO-2026-01-13-06-20-33
11-4 PHOTO-2026-02-11-14-44-59
11-5 PHOTO-2026-02-25-15-16-35
11-6 PHOTO-2026-02-25-15-16-51
11-7 Image-2
previous arrow
next arrow

Scope of Works:

1. Technological Line Modernization

  • Construction of foundations for technological equipment.
  • Installation of steel structures for technological equipment.
  • Installation of technological equipment. Runding
  • Installation of reinforcement section and wall panel production equipment.

2. Repair Works on WEHRHAHN Equipment:

  • Replacement of rotation bearing housings of the main tilting frame.
  • Repositioning of the driven gear and installation of the girth gear shaft of the Cemtec mill.
  • Replacement of rail tracks on autoclaves No. 1 and 2.

We build plants! We'll offer effective solutions for your project.