We build plants!

Completed Projects

From concept to reality

Autoclaved Aerated Concrete (AAC) block manufacturing plant “Glavstroy-Ust-Labinsk”

Contractor: UNY-Tec LLC Installation period: December 2025 – March 2026

AAC Block Manufacturing Plant “DG-Block”

Contractor: UNY-Tec LLC Construction period: 2024–2026

PSK “BKI” – Industrial Park “Esipovo” Moscow Region, Russia

General Contractor: UNY-Tec LLC Construction period: 2024–2025

Data Center “Selectel” Moscow, Russia

Contractor: UNY-Tec LLC Construction period: 2024–2025

AAC Block Manufacturing Plant “FSK-North” Zelenograd, Moscow

Contractor: UNY-Tec LLC Construction period: 2024–2025

AAC Products Manufacturing Plant “Berit” - Sverdlovsk Region, Russia (Gabievsky Industrial Park)

Contractor: UNY-Tec LLC Construction period: 2024–2025

Heavy Machinery Plant “YuZTS” Krasnodar, Russia

Contractor: UNY-Tec LLC Construction period: 2023–2024

Refrigerator storage for fruits and vegetables «OPH» Krasnodar region, Russia

Contractor: UNY-Tec LLC Construction period: April-September 2023

AAC Plant “KSMK-M8”

Sergiev Posad, Moscow Region, Russia Construction period: 2022–2023

Distribution Center “Bryanskiy”

(X5 Retail Group, “Pyaterochka”) Dobrun village, Bryansk Region, Russia Construction period: 2021–2022

Lime Production Plant “ZPI”

Kasimov, Ryazan Region, Russia Construction period: 2018–2020

St. Peter and St. Fevronia Church (Murom Saints) Kasimov, Ryazan Region, Russia

General Contractor: UNY-Tec LLC Construction period: 2018–2021

AEROC Plant “LSR-Wall Materials” Saint Petersburg, Russia

Dismantling and installation of technological equipment: UNY-Tec LLC Reconstruction period: 2018–2019

Autoclaved Aerated Concrete (AAC) Plant “Kazbek” Chechen Republic, Russia

Installation of technological equipment: UNY-Tec LLC Reconstruction period: 2018–2019

“Sapsan – Warm Stone” Plant

Volokolamsk, Moscow Region, Russia General Contractor: Profil-Stroy NN LLC

Poritep Plant Bogorodsk, Nizhny Novgorod Region

Installation of technological equipment: UNY-Tec LLC Construction period: 2014–2015

OMYA Kaluga Plant Vorsino, Kaluga Region

General Contractor: Profil-Stroy NN LLC Construction period: 2012–2014

Poritep Plant - Novomichurinsk, Ryazan Region

General Contractor: Profil-Stroy LLC Construction period: 2011–2013

Elgad-ZSI Plant Kolomna, Moscow Region

Installation of technological equipment based on Wehrhahn technology: Profil-Stroy LLC Construction period: 2011–2012

“TIGR” Terminal Lobnya, Moscow Region

Construction of a customs warehouse terminal. General Contractor: Profil-Stroy LLC

“NPO Tekhnologiya” Obninsk, Kaluga Region

Installation of the autoclave section: Profil-Stroy LLC

DSK GRAS-Kaluga Plant (“Bonolit-Kaluga”) Kaluga Region

General Contractor: Profil-Stroy LLC Construction period: 2007–2009

SCS Plant Smolensk Region

General Contractor: Profil-Stroy LLC Construction period: 2006–2007

Reinforced Concrete Plant (JSC “Zhelezobeton”) Moscow Region

Contractor: Profil-Stroy LLC Construction period: 2005–2006