SCS Plant Smolensk Region

General Contractor: Profil-Stroy LLC Construction period: 2006–2007

Dry construction materials manufacturing plant.
Plant capacity: 60,000tons per year.
Production line: AML.
Construction period: 2006–2007.
image112-1
previous arrow
next arrow
image112-1
image113-1
114-1
117-1
image115-1
image116-1
previous arrow
next arrow

Scope of Works:

  • Construction of finished goods warehouse: 3,500 m².
  • Construction of production building with 400 tons of steel structures.
  • Fabrication and installation of storage (silo) equipment with volumes ranging from 100 to 180 m³.
  • Construction of auxiliary facilities, including security checkpoint, weighbridge, compressor station, transformer substation, and sand drying facility.
  • Design of finished goods warehouse, production building, and cement unloading and storage system.
  • Fabrication and installation of steel structures for cement unloading, storage, and feeding systems to working silos, including installation of technological equipment and automation systems.
  • Installation of technological equipment.